Cogealac Wind Farm, Constanta, Romania

PROJECT FILE

  • 101 wind turbines of 2.5 MW
  • 3 substations of 110/33 kV 1 X 80 MVA
  • 110 kV underground cable network for the connection between the substation and the Tariverde Main Transformer Station–around 11.3 km
  • 33 kV underground cable network, the length for the connection between the turbines and the transformer substations – around 53 km

INVESTMENT DESCRIPTION
Ovidiu Development S.R.L. develops in the Cogealac – Gradina area a wind farm with a final installed power of 252.5 MW. The park is developed in several stages: 20 turbines, 32 turbines, 5 turbines, 6 turbines, 30 turbines. In the first stage, the Cogealac 1 station, a transformation and a connection station are built.

The stations Cogealac 2 and Gradina are connected to this station. The connection between the Cogealac 1 substation and the 110/400 kV Transformer substation is achieved through a double 110 kV underground cable network.

101 turbines are connected to the 33/110 kV Transformer substations through a 33 kV underground cable network with a total length of 20 km.

ClientS.C. OVIDIU DEVELOPMENT S.R.L.
LocationCogealac, Constanta
Type of workTurnkey project
Installed power252.5 MW
Voltage levelHigh Voltage, Medium Voltage
Year of completion2011 – 2013