110/20 kV Indoor Power Substation Afi Palace Cotroceni

Africa-Israel Europe (AFI Europe), division of the Israeli group Africa-Israel Investments, is the owner of the Cotroceni Park project. The Cotroceni Park project is located in Bucharest, District 6, and covers an area of ​​12 hectares.

  • The new 110/20 kV Cotroceni Park (Razoare) transformer station is located in Bucharest and has an installed capacity of 2 x 25 MVA, the main equipment being ABB equipment
  • The 110 kV and 20 kV stations are the interior type and all the equipment that is installed in the 110/20 kV station is located in a building consisting of: basement, ground floor, first floor, second floor
  • The electric circuit of the interior substation is with a single section bar, to which 7 cells have been connected (4 cells of cable lines – Panduri, Filaret, Militari, Grozaveşti, two transformer cells, a coupler cell)
  • The electrical station layout is with a single section bar to which 19 closed cells have been connected
  • This work was fully connected to the connection fee and fully corresponds to the requirements and standards of ENEL Muntenia Sud
Client S.C. COTROCENI PARK S.A.
Location Bucharest
Type of work Turnkey Project
Installed power 2 x 25 MVA
Voltage Level High Voltage (110 kV), Medium Voltage (20 kV)
Year of completion 2009
Time 20 months

Interested in a discussion?

Contact us